Sunday 25th April, 2021
62.9km (total ascent 1,231m)
Drive to Isehara. Cycle to the dam and then onto Sagamiko. Then down through Atsugi and back to Isehara. Great to be back in the car with the bike on the back!
Sunday 25th April, 2021
62.9km (total ascent 1,231m)
Drive to Isehara. Cycle to the dam and then onto Sagamiko. Then down through Atsugi and back to Isehara. Great to be back in the car with the bike on the back!